Real Cisco Certified Intenet Expert Data Center 400-151 Exam Questions

      Comments Off on Real Cisco Certified Intenet Expert Data Center 400-151 Exam Questions

Cisco Certified Intenet Expert Data Center 400-151 exam is a milestone in the industry to endorse your proficiency. Passing Cisco Certified Intenet Expert Data Center Cisco 400-151 exam entitles you for the achievement of Expert certification exam. We at TheDumps provide you latest Cisco 400-151 dumps. The candidates those who endorse their proficiency by passing the Cisco Data Center Management 400-151 exam get the edge in the industry and get better employment opportunities.

Vendor Cisco
Exam Code 400-151
Full Exam Name CCIE Data Center
Certification Name Cisco Certified Intenet Expert Data Center
Technology Data Center Management

♥ 2019 Valid 400-151 Exam Dumps ♥

400-151 exam questions, 400-151 PDF dumps; 400-151 exam dumps:400-151 Exam Questions(276 Q&A) (New Questions Are 100% Available! Also Free Practice Test Software!)

Latest and Most Accurate Cisco 400-151 Exam Dumps:

Version: 18.0
Question: 1

Refer to the exhibit.
A virtual machine in the EPG “Clients” is unable to communicate via ICMP with a virtual machine in
the EPG “Server”. Which option is the most likely cause of this issues?

A. The EPG “Server” is providing the relevant contract but the EPG “Clients” is not consuming the
contract
B. Not enough detail is provided in the output to determine the exact cause
C. There is no issue because the configured rules permit ICMP traffic
D. No contract is configured between the two EPGs

Answer: D

Question: 2

Refer to the exhibit.
After you upgrade Cisco UCS firmware, some of your blades have these error messages. Which
description of the problem is true?

A. Storage provisioning is not configured
B. Some components are deprecated
C. vNIC template must be converted to updating
D. Service profile requires a connectivity policy

Answer: D

Question: 3

Refer to the exhibit.
Using GET method with this XML code, which two pieces of information about Application Policy
Infrastructure Controllers shows the output? ( Choose two)

A. ports of the leaves where the APICs are connected
B. hard disks status for each APIC in the cluster
C. APIC version installed on each node
D. serial number of each APIC in the cluster
E. admin status of each APIC in the cluster
F. number of network interfaces of each APIC

Answer: DE

Question: 4

Refer to the exhibit.
An admin has created a new EPG in an ACI fabric. The admin then specified static path binding as
shown in exhibit. After submitting this policy configuration, the admin noticed that this newly
created EPG had the fault
shown in the exhibit. Which option is the likely explanation of this fault?

A. There is no fault. The fault is currently in the soaking state and the fault will automaticlly clear and
everything will work as expected
B. The encap VLAN configured is not within the allowed range of VLANs as specified by the
associated domain
C. There is not enough information to determine the cause of the problem
D. The admin incorrectly configured this static path as a “trunk” when it should have been configured
as an access (untagged) port

Answer: B

Question: 5

A network architect must migrate the legacy infrastructure switches of a customer from a Cisco
Nexus 9000 platform. Which process helps achieve this milestone?

A. Create a container providing separate execution space
B. Manage software upgrades via guest shell
C. Allow guests temporary access to the CLI without logging in
D. Set up a web-based interface for configuration management

Answer: A

Question: 6

Which two components are the responsibility of the customers in a Platform as a Service offering?
(Choose two)

A. APIs
B. infrastructure connectivity
C. applications
D. hardware
E. data

Answer: CE